Modesto Irrigation District's 104,671 residential customers in California paid an average of 23.03¢ per kWh in 2025, for an average bill of $173.07 a month on 751 kWh.1 Over the last 12 months (Sep 2025–Aug 2026) the average was 23.54¢, and 23.67¢ in August 2026.2

EIA-861 2025 final (released October 7, 2026) and EIA's monthly utility survey through August 2026 (preliminary); next monthly update expected November 24, 2026. Averages are revenue divided by kWh, all charges included: not the rate printed in a tariff.

2 of 58 California counties served (EIA-861 2025)

A Modesto Irrigation District home paid 23.03¢ per kWh on average in 2025, well below the 37.52¢ per kWh paid by PG&E's full-service customers, yet its monthly bill of $173.071 was almost the same as a PG&E full-service bill. MID homes buy far more electricity, especially in August, and they lose very little time to outages: 36 minutes in 2025, against a California average of 345 minutes9.

What MID homes paid per kWh

The Modesto Irrigation District is a public power district: a local public agency that sells both the electricity and its delivery to all 104,6711 of its residential customers. With no supplier choice and no delivery-only group, one residential average covers every home it serves. That average is average revenue per kWh, meaning total residential revenue divided by kWh sold. It includes fixed monthly charges and any adjustments, and it is not a line on MID's rate schedule.

In calendar 2025 (EIA-861, final), MID's residential average was 23.03¢ per kWh1. Over the last 12 months, September 2025 to August 2026, it was 23.54¢ per kWh in EIA's monthly survey, whose 2026 months are preliminary. August 20263 alone came in at 23.67¢ per kWh, +1.7%2 against the same month of 2025.

That price is middling for California and high for public power. Among the 25 California utilities with 10,000 or more residential customers, MID's 2025 average was the 12th highest, 26.5% below the California average. California's public utilities as a group averaged 22.74¢ per kWh for residential customers, close to MID. Nationally, MID ranked 21st highest of 177 large utilities, whose median was 15.07¢ per kWh, and its average was 58.9% above the national average for public power1.

Between Turlock Irrigation District and PG&E

The lowest residential average among California's larger utilities in 2025 belonged to Turlock Irrigation District, at 17.40¢ per kWh, against MID's 23.03¢ per kWh. EIA's service-territory records list Turlock Irrigation District in Stanislaus County, one of MID's two counties, so the two irrigation districts serve homes in the same county. PG&E, whose full-service residential customers paid 37.52¢ per kWh1, is listed in both of MID's counties.

California utilities by average residential price, 2025
Turlock Irrigation District17.40¢
City of Santa Clara17.88¢
SMUD18.93¢
City of Redding18.97¢
City of Azusa20.77¢
City of Roseville21.29¢
City of Palo Alto21.36¢
City of Burbank Water and Power21.50¢
City of Lodi22.78¢
City of Colton23.00¢
Alameda Municipal Power24.01¢
Merced Irrigation District24.15¢
PacifiCorp24.18¢
City of Pasadena25.11¢
LADWP26.48¢
Liberty Utilities27.65¢
California average31.35¢
City of Glendale35.51¢
PG&E37.52¢
Bear Valley Electric Service41.12¢
SDG&E45.77¢

Source: EIA-861 annual electric power industry report, 2025 final. Utilities with 10,000 or more bundled (full-service) residential customers. Revenue divided by kWh sold, all charges included, EIA-861 2025 final. Darker bars have their own page. In this state, customers who buy supply from a competitive supplier are not in these averages (they pay delivery to the utility and supply to the supplier).

Show the numbers
Utility¢/kWh
Turlock Irrigation District17.40¢
City of Santa Clara17.88¢
Imperial Irrigation District18.69¢
SMUD18.93¢
City of Redding18.97¢
Anaheim Public Utilities19.37¢
City of Azusa20.77¢
City of Roseville21.29¢
City of Palo Alto21.36¢
City of Burbank Water and Power21.50¢
Riverside Public Utilities21.94¢
City of Lodi22.78¢
City of Colton23.00¢
Modesto Irrigation District23.03¢
Alameda Municipal Power24.01¢
Merced Irrigation District24.15¢
PacifiCorp24.18¢
City of Pasadena25.11¢
LADWP26.48¢
Liberty Utilities27.65¢
California average31.35¢
Southern California Edison31.48¢
City of Glendale35.51¢
PG&E37.52¢
Bear Valley Electric Service41.12¢
SDG&E45.77¢

These are averages for the whole customer base, not prices a household can choose between. EIA's territory records place MID in San Joaquin and Stanislaus counties, and in both at least one other utility also reports customers. Each home is served by whichever utility's lines reach its address, and MID's own service-area map, not the city or ZIP code, settles that.

Counties where Modesto Irrigation District reports customers in California
Counties where Modesto Irrigation District reports customers in CaliforniaLos Angeles County: not served by Modesto Irrigation DistrictNevada County: not served by Modesto Irrigation DistrictSanta Barbara County: not served by Modesto Irrigation DistrictSan Bernardino County: not served by Modesto Irrigation DistrictRiverside County: not served by Modesto Irrigation DistrictVentura County: not served by Modesto Irrigation DistrictPlumas County: not served by Modesto Irrigation DistrictGlenn County: not served by Modesto Irrigation DistrictInyo County: not served by Modesto Irrigation DistrictStanislaus County: Modesto Irrigation District reports service, with 3 other utilitiesContra Costa County: not served by Modesto Irrigation DistrictSolano County: not served by Modesto Irrigation DistrictFresno County: not served by Modesto Irrigation DistrictKern County: not served by Modesto Irrigation DistrictYuba County: not served by Modesto Irrigation DistrictButte County: not served by Modesto Irrigation DistrictAlameda County: not served by Modesto Irrigation DistrictSan Francisco County: not served by Modesto Irrigation DistrictMarin County: not served by Modesto Irrigation DistrictDel Norte County: not served by Modesto Irrigation DistrictModoc County: not served by Modesto Irrigation DistrictLassen County: not served by Modesto Irrigation DistrictYolo County: not served by Modesto Irrigation DistrictMerced County: not served by Modesto Irrigation DistrictKings County: not served by Modesto Irrigation DistrictLake County: not served by Modesto Irrigation DistrictSanta Cruz County: not served by Modesto Irrigation DistrictSierra County: not served by Modesto Irrigation DistrictAmador County: not served by Modesto Irrigation DistrictTuolumne County: not served by Modesto Irrigation DistrictMonterey County: not served by Modesto Irrigation DistrictSan Mateo County: not served by Modesto Irrigation DistrictSan Luis Obispo County: not served by Modesto Irrigation DistrictTehama County: not served by Modesto Irrigation DistrictSan Diego County: not served by Modesto Irrigation DistrictMendocino County: not served by Modesto Irrigation DistrictColusa County: not served by Modesto Irrigation DistrictSan Benito County: not served by Modesto Irrigation DistrictSutter County: not served by Modesto Irrigation DistrictSacramento County: not served by Modesto Irrigation DistrictNapa County: not served by Modesto Irrigation DistrictAlpine County: not served by Modesto Irrigation DistrictEl Dorado County: not served by Modesto Irrigation DistrictMono County: not served by Modesto Irrigation DistrictTulare County: not served by Modesto Irrigation DistrictImperial County: not served by Modesto Irrigation DistrictPlacer County: not served by Modesto Irrigation DistrictTrinity County: not served by Modesto Irrigation DistrictCalaveras County: not served by Modesto Irrigation DistrictHumboldt County: not served by Modesto Irrigation DistrictShasta County: not served by Modesto Irrigation DistrictSan Joaquin County: Modesto Irrigation District reports service, with 5 other utilitiesOrange County: not served by Modesto Irrigation DistrictMariposa County: not served by Modesto Irrigation DistrictSonoma County: not served by Modesto Irrigation DistrictSanta Clara County: not served by Modesto Irrigation DistrictMadera County: not served by Modesto Irrigation DistrictSiskiyou County: not served by Modesto Irrigation District

Source: EIA-861 2025, service territory; Census Bureau, Cartographic boundary file, counties. EIA-861 2025 service territory: 2 counties. Counts whole counties even where the utility serves only part of one; check the utility's own service-area map for an address.

Show the numbers
CountyOther utilities reporting service
San Joaquin CountyPG&E, City of Lodi, Lathrop Irrigation District, Port of Stockton, WAPA-- Western Area Power Administration
Stanislaus CountyPG&E, Turlock Irrigation District, WAPA-- Western Area Power Administration

About the same monthly bill as PG&E

MID homes used 751 kWh a month on average in 2025. California's average was 494 kWh, the lowest among the states, and PG&E's full-service homes used 464 kWh1. The US average was 874 kWh6.

Electricity bought per home each month, MID and nearby utilities, 2025
City of Lodi (CA)562
Turlock Irrigation District (CA)814

Source: EIA-861 annual electric power industry report, 2025 final. EIA-861 2025 final. Average revenue per kWh is all charges divided by kWh; it is not a tariff rate.

Show the numbers
Utilityaverage monthly residential use
PG&E (CA)464
City of Lodi (CA)562
SMUD (CA)663
Modesto Irrigation District (CA)751
Turlock Irrigation District (CA)814

More kWh at a lower price produced almost the same bill. MID's average residential bill in 2025 was $173.07; PG&E's full-service average was $173.951. Both were above California's all-provider average of $154.73 and the US average of $150.686. The PG&E figures cover only homes that buy both power and delivery from PG&E; homes on its wires that buy power from a community choice aggregator are a separate group, described on the PG&E page.

Average monthly residential bill, MID and nearby utilities, 2025
SMUD (CA)$125.42
City of Lodi (CA)$128.02
Turlock Irrigation District (CA)$141.66
PG&E (CA)$173.95

Source: EIA-861 annual electric power industry report, 2025 final. EIA-861 2025 final. Average revenue per kWh is all charges divided by kWh; it is not a tariff rate.

Show the numbers
Utilityaverage monthly residential bill
SMUD (CA)$125.42
City of Lodi (CA)$128.02
Turlock Irrigation District (CA)$141.66
Modesto Irrigation District (CA)$173.07
PG&E (CA)$173.95

2025: a higher price, a smaller bill

Between 2024 and 2025, MID's residential average rose 5.7%, from 21.78¢ per kWh to 23.03¢ per kWh. Over the same years California's average across all providers changed −1.9%8. Yet the average MID bill fell from $176.01 to $173.07 (−1.7%), because use per home dropped from 808 kWh7 to 751 kWh1 a month. The drop in use outweighed the higher price per kWh.

MID's prices are not set by the state. As the Legislative Analyst's Office explains, publicly owned utilities in California are government agencies whose rates are set by their own governing boards of local elected officials, not by the California Public Utilities Commission. MID's board decisions and current schedules are published by the district.

The chart below follows MID's average month by month. The 12-month average for September 2025 to August 2026, 23.54¢ per kWh2, was above the calendar-2025 figure; 2026 months are preliminary.

Modesto Irrigation District: residential price each month, Jan 2025 to Aug 2026
Modesto Irrigation District: residential price each month, Jan 2025 to Aug 202615¢20¢25¢30¢35¢20252026

Source: EIA-861M monthly sales and revenue by utility; EIA, Electric Power Monthly / EIA-861M sales and revenue by state. Residential revenue divided by kWh in each month, as reported to EIA's monthly survey (EIA-861M; months since January 2026 preliminary).

Show the numbers
MonthModesto Irrigation District (¢/kWh)kWh per customerBill per customer
January 202521.45¢780$167.42
February 202522.09¢636$140.50
March 202522.43¢567$127.08
April 202522.44¢558$125.27
May 202523.72¢591$140.27
June 202524.46¢802$196.25
July 202523.53¢1,003$235.92
August 202523.28¢1,066$248.04
September 202523.20¢1,107$256.78
October 202523.17¢720$166.82
November 202523.21¢538$124.84
December 202522.70¢682$154.85
January 202622.67¢763$172.96
February 202623.43¢611$143.04
March 202623.80¢583$138.69
April 202623.73¢575$136.53
May 202624.58¢582$143.13
June 202624.38¢812$197.93
July 202623.96¢1,021$244.73
August 202623.67¢1,179$279.02

August sets the bill

Use per MID home over the last 12 months (September 2025 to August 2026) ran from 538 kWh in November 2025 to 1,179 kWh in August 2026, more than double. The average bill followed, from $124.84 to $279.02. PG&E's full-service homes also peaked in August 2026, at 764 kWh2.

Modesto Irrigation District: average residential use and bill by month

Source: EIA-861M monthly sales and revenue by utility. kWh per residential customer in each month (EIA-861M; months since January 2026 preliminary). The table adds the average bill and price for the month.

Show the numbers
MonthkWh per customerBill per customer¢/kWh
September 20251,107$256.7823.20¢
October 2025720$166.8223.17¢
November 2025538$124.8423.21¢
December 2025682$154.8522.70¢
January 2026763$172.9622.67¢
February 2026611$143.0423.43¢
March 2026583$138.6923.80¢
April 2026575$136.5323.73¢
May 2026582$143.1324.58¢
June 2026812$197.9324.38¢
July 20261,021$244.7323.96¢
August 20261,179$279.0223.67¢

Averaged over those 12 months, an MID home used 765 kWh and paid $179.982 a month. Monthly prices per kWh move with the season too, so a single month's average is best compared with the same month a year earlier, not with the annual figure.

Outages: a small fraction of California's average

MID customers averaged 36 minutes without power in 2025 including major events, fewer than the California average of 345 minutes, and 31 minutes excluding major event days. They had 0.43 interruptions per customer, against 1.27 statewide (IEEE 1366). PG&E's customers averaged 273 minutes9 including major events.

Outage minutes per customer, all events, 2025
Turlock Irrigation District (CA)62
City of Lodi (CA)72

Source: EIA-861 2025, reliability. EIA-861 2025 final. Average revenue per kWh is all charges divided by kWh; it is not a tariff rate.

Show the numbers
Utilityoutage minutes per customer (all events)
Modesto Irrigation District (CA)36
SMUD (CA)50
Turlock Irrigation District (CA)62
City of Lodi (CA)72
PG&E (CA)273

Smart meters, time-of-use and rooftop solar

Every MID residential meter was an advanced (AMI) meter in 2025 (100.0%). Few homes were billed on time-varying rates: 1,040 residential customers, 1.0% of the total, were enrolled in time-of-use pricing, against 35.9% of homes across California and 13.0%10 on PG&E's wires.

MID reported 11,986 net-metered residential solar installations with 60.9 megawatts of capacity in 2025: 114.5 per 1,000 residential customers, below California's 156.0 and PG&E's 182.910. Power that panels generate and use on site is not in EIA's kWh per home, which counts only what MID sells.

Business customers and help with bills

MID's 29,752 commercial customers paid an average of 18.23¢ per kWh in 2025, below the residential average, with a monthly bill of $435.93. Its 140 industrial customers paid 13.16¢ per kWh, and across all 134,563 accounts the average was 18.42¢ per kWh1.

Households struggling with summer bills can apply for federal LIHEAP aid, which brought California $242.1 million11 in fiscal year 2026. For prices across the state and its other utilities, see electricity in California.

Modesto Irrigation District electricity: common questions

What is MID's electric rate per kWh?

MID's residential customers paid an average of 23.03¢ per kWh1 in 2025 (EIA-861, final) and 23.54¢ per kWh2 over the last 12 months, September 2025 to August 2026 (EIA-861M, 2026 months preliminary). These averages divide everything MID billed homes by the kWh they bought, so they blend fixed charges and energy charges. The separate charges are on MID's published rate schedules.

What is the average MID electric bill?

$173.07 a month in 2025, for 751 kWh1 of use. Over the 12 months to August 20263 the average was $179.98, from $124.84 in November 2025 to $279.02 in August 20262 (preliminary).

Is MID cheaper than PG&E?

Per kWh, yes: in 2025 MID's residential customers paid 23.03¢ per kWh on average and PG&E's full-service residential customers 37.52¢ per kWh. Per month the two were close ($173.07 against $173.951) because MID homes used more electricity. The address decides which utility serves a home.

Did MID raise its electric rates?

MID's residential average rose 5.7%1 from 2024 to 2025 in EIA's annual data, and the August 20263 average was +1.7%2 against the same month a year earlier (preliminary). MID's rates are set by its own board, not by the California Public Utilities Commission.

Related pages

Sources

  1. EIA-861 annual electric power industry report, 2025 final; table Sales_Ult_Cust_2025; 2025, final; released October 7, 2026. www.eia.gov
  2. EIA-861M monthly sales and revenue by utility; table sales_ult_cust_2025 and _2026; released October 23, 2026. www.eia.gov
  3. EIA, Electric Power Monthly / EIA-861M sales and revenue by state; table sales_revenue.xlsx (EPM Table 5.6.A); January 2001 to 2026-08; months since January 2026 preliminary; released October 23, 2026. www.eia.gov
  4. EIA-861 2025, service territory; table Service_Territory_2025; 2025, final; released October 7, 2026. www.eia.gov
  5. Census Bureau, Cartographic boundary file, counties; table cb_2025_us_county_5m; cb_2021_us_county_5m; 2025 (2021 for Connecticut). www.census.gov
  6. EIA-861 2025, average monthly bill by state; table Average_Bill_2025; 2025, final; released October 7, 2026. www.eia.gov
  7. EIA-861 annual electric power industry report, 2024 final; table Sales_Ult_Cust_2024; 2024, final (file updated December 3, 2025); released December 3, 2025. www.eia.gov
  8. EIA, Historical state data, annual sales, revenue and customers; table HS861 2010-.xlsx; 2010-2025, final; released October 7, 2026. www.eia.gov
  9. EIA-861 2025, reliability; table Reliability_2025; 2025, final; released October 7, 2026. www.eia.gov
  10. EIA-861 2025, advanced meters, dynamic pricing and net metering; table Advanced_Meters, Dynamic_Pricing, Net_Metering 2025; 2025, final; released October 7, 2026. www.eia.gov