Lubbock Power & Light rates: what delivery costs a Lubbock home
Lubbock Power & Light delivers electricity to 94,738 homes in Texas but sells none: residential customers buy from a retail electric provider of their choice, who bills the delivery charges too.1 In 2025 Lubbock Power & Light's residential delivery revenue averaged 6.31¢ per kWh, about $55.17 a month per home; Texas retail providers' residential customers paid 17.23¢ per kWh on average, delivery included.
EIA-861 2025 final, released October 7, 2026; the next annual release is due in August 2027. Averages are revenue divided by kWh, all charges included: not the rate printed in a tariff.
1 of 254 Texas counties served (EIA-861 2025)
Since 2024 Lubbock Power & Light has delivered electricity to about 95,000 homes without selling it: they buy power from a retail electric provider. Its delivery revenue averaged 6.31¢ per kWh in 2025, the 2nd highest of the 6 Texas delivery utilities, yet the delivery part of a home's bill, about $55.171 a month, was the smallest of the six because Lubbock homes on its wires used the least electricity.
LP&L rates per kWh: only the delivery part
Since 2024 there has been no single LP&L rate per kWh to quote. Lubbock Power & Light, owned by the City of Lubbock, now handles only delivery: the poles, wires, meters and outage repairs. The electricity itself is sold by a retail electric provider, whose bill combines its own energy charge with LP&L's delivery charges.
EIA's annual survey of utilities (form EIA-861) reports what LP&L billed for that delivery service. Its residential delivery revenue averaged 6.31¢ per kWh in 2025: everything it billed homes for delivery, including fixed monthly charges, divided by the kWh they used. That is an average, not a line in LP&L's tariff, and it covers only part of a bill. Businesses averaged 5.01¢ per kWh across 14,7431 commercial accounts.
The 2025 average was +4.0% above the 6.07¢ per kWh2 of 2024. Read that change with care: 2024 was the year LP&L's customers moved to retail providers, so its delivery-only figures cover a transition year rather than a full year of the new arrangement. Among the other Texas delivery utilities, the same 2024 to 2025 change ranged from +2.8% at AEP Texas Central to +12.0%1 at TNMP.
High per kWh, low per month
LP&L's delivery revenue per kWh was the 2nd highest of the 6 Texas delivery utilities in 2025, behind only TNMP's 7.09¢ per kWh. Per home, the order flips. A Lubbock home on LP&L's wires used an average of 874 kWh a month, less than any other delivery utility's customers: 1,106 kWh on Oncor's wires and 1,124 kWh on CenterPoint Energy's. Delivery therefore came to about $55.17 a month per home, against $62.35 for Oncor and $81.641 for TNMP.
The two readings fit together. Part of any delivery bill is a fixed monthly charge, and when homes use fewer kWh that charge is spread over fewer of them, which raises the average per kWh even when the monthly amount is lower. The monthly figure is closer to what a household sees for delivery on its bill; the per-kWh charges are what retail providers pass through in their plan prices.
| Oncor | 3,545,814 | 5.64¢ | $62.35 | 99 | 232 |
|---|---|---|---|---|---|
| CenterPoint Energy | 2,529,039 | 5.41¢ | $60.74 | 12 | 193 |
| AEP Texas Central | 793,896 | 5.91¢ | $68.16 | 44 | 205 |
| TNMP | 237,930 | 7.09¢ | $81.64 | 42 | 165 |
| AEP Texas North | 158,488 | 5.86¢ | $57.47 | 51 | 133 |
| Lubbock Power & Light | 94,738 | 6.31¢ | $55.17 | 1 | 111 |
Source: EIA-861 annual electric power industry report, 2025 final; EIA-861 2025, reliability; EIA-861 2025, service territory. EIA-861 2025, delivery companies: residential delivery revenue divided by kWh and by customers. Outage minutes: SAIDI with major event days.
LP&L is also the smallest of the six: 94,738 residential customers in 2025, against 158,488 for AEP Texas North, the next smallest, and 3,545,8141 for Oncor.
How a city utility joined the competitive market
Lubbock's position is unusual. The city was not on the ERCOT grid, which covers most of Texas, until LP&L moved over in stages; its neighbor Xcel Energy remains in SPP1. The Electric Reliability Council of Texas describes the steps: the Public Utility Commission of Texas approved LP&L's application in March 2018, most customers moved onto the ERCOT grid over Memorial Day weekend in 2021, the remainder followed in December 2023, and LP&L became the first municipally owned utility in Texas to enter ERCOT's competitive retail market.
Homes then had a window to choose a provider. The Public Utility Commission of Texas set it from January 5 to February 15, 2024, and customers who did not choose were assigned a default provider and could switch later. ERCOT's market notice records the transfer of retail service to competitive providers between March 4 and April 1, 2024. 2025 is therefore the first full year in which EIA's figures show LP&L as a delivery-only utility.
What Lubbock homes paid their retail providers
EIA does not publish an all-in price for Lubbock. What it does report is what each Texas retail electric provider collected from its residential customers over the whole year, delivery included, across all its plans and all the areas it serves. Statewide, those providers averaged 17.23¢ per kWh in 2025; among the 38 with 10,000 or more residential customers, averages ran from 8.03¢ per kWh (Southern Federal Power, LLC) to 20.86¢ per kWh1 (Young Energy, LLC). These are past averages, not offers, and none of them is specific to Lubbock.
Source: EIA-861 annual electric power industry report, 2025 final. The 10 largest providers by residential customers (EIA-861 2025, Part D). Each figure is the provider's total residential revenue divided by kWh, delivery included, across all its plans in the year: a past average, not an offer or a plan price.
Show the numbers
| Retail provider | ¢/kWh (2025 average) | Residential customers |
|---|---|---|
| Champion Energy Services | 10.16¢ | 218,102 |
| US Retailers, LLC | 15.77¢ | 416,504 |
| Just Energy | 16.92¢ | 437,966 |
| Value Based Brands LLC | 17.15¢ | 245,378 |
| Direct Energy Services | 17.30¢ | 259,458 |
| Gexa Energy, LP | 17.42¢ | 310,726 |
| Reliant Energy Retail Services | 18.38¢ | 1,545,510 |
| Green Mountain Energy Company | 18.49¢ | 273,660 |
| TXU Energy Retail Co, LLC | 19.36¢ | 1,442,516 |
| Ambit Energy Holdings, LLC | 19.74¢ | 364,649 |
Plans available at a Lubbock address, with the energy charge, LP&L's delivery charges and the average price at 500, 1,000 and 2,000 kWh on each Electricity Facts Label, are listed on the Public Utility Commission's Power to Choose site. The Texas retail choice guide explains how to read those labels.
Lubbock County: which utility serves which address
EIA's service-territory records place LP&L in Lubbock County4 only. The county is shared: Xcel Energy and two electric cooperatives, South Plains Electric Cooperative and Lyntegar Electric Cooperative, also report customers there. Homes served by those three utilities sit on a different grid (SPP, not ERCOT) and are outside the competitive market: they buy from their utility at its bundled price, which for Xcel Energy averaged 13.94¢ per kWh1 in 2025, supply and delivery together. That figure is not comparable with LP&L's delivery-only average. Living in Lubbock County does not by itself mean a home can choose a provider; the utility's own service map, or the utility named on the current bill, decides by address.
Source: EIA-861 2025, service territory; Census Bureau, Cartographic boundary file, counties. EIA-861 2025 service territory: 1 counties. Counts whole counties even where the utility serves only part of one; check the utility's own service-area map for an address.
Show the numbers
| County | Other utilities reporting service |
|---|---|
| Lubbock County | Xcel Energy, South Plains Electric Cooperative, Lyntegar Electric Cooperative |
Outages and smart meters
LP&L's customers averaged 111 minutes without power in 2025 counting major events, fewer than the Texas average of 225 minutes, and 95 minutes excluding them, with 1.70 interruptions per customer. LP&L reports under the IEEE 1366 standard, as Xcel Energy, CenterPoint Energy and the two AEP Texas utilities do; Xcel Energy's Texas customers averaged 441 minutes3 on the same basis. Outages and meter problems go to LP&L, not to the retail provider.
Source: EIA-861 2025, reliability. EIA-861 2025 final. Average revenue per kWh is all charges divided by kWh; it is not a tariff rate.
Show the numbers
| Utility | outage minutes per customer (all events) |
|---|---|
| Lubbock Power & Light (TX) | 111 |
| AEP Texas North (TX) | 133 |
| CenterPoint Energy (TX) | 193 |
| AEP Texas Central (TX) | 205 |
| Xcel Energy (TX) | 441 |
Every residential meter LP&L reported in 2025 was an advanced meter (100.0%6), which is what lets retail providers bill by interval and offer time-of-use plans. The Texas state page sets LP&L beside the rest of the state's utilities.
Lubbock Power & Light rates: common questions
What is Lubbock Power & Light's rate per kWh?
LP&L no longer sells electricity to homes, so it has no all-in rate. What it billed for delivery averaged 6.31¢ per kWh1 in 2025: its residential delivery revenue, monthly charges included, divided by kWh. The energy price depends on the retail provider and plan a home chose; current plans and their Electricity Facts Labels are on Power to Choose.
Can I still buy electricity from Lubbock Power & Light?
No. Retail service for LP&L's customers moved to competitive retail electric providers between March 4 and April 1, 2024, according to ERCOT. LP&L still owns the lines and meters, and the provider's bill includes LP&L's delivery charges.
Did Lubbock Power & Light's delivery charges go up?
LP&L's residential delivery revenue per kWh rose +4.0%, from 6.07¢ per kWh2 in 2024 to 6.31¢ per kWh1 in 2025. The 2024 figure covers the year customers moved to retail providers, so it is a partial-year starting point.
Related pages
Sources
- EIA-861 annual electric power industry report, 2025 final; table Sales_Ult_Cust_2025; 2025, final; released October 7, 2026. www.eia.gov
- EIA-861 annual electric power industry report, 2024 final; table Sales_Ult_Cust_2024; 2024, final (file updated December 3, 2025); released December 3, 2025. www.eia.gov
- EIA-861 2025, reliability; table Reliability_2025; 2025, final; released October 7, 2026. www.eia.gov
- EIA-861 2025, service territory; table Service_Territory_2025; 2025, final; released October 7, 2026. www.eia.gov
- Census Bureau, Cartographic boundary file, counties; table cb_2025_us_county_5m; cb_2021_us_county_5m; 2025 (2021 for Connecticut). www.census.gov
- EIA-861 2025, advanced meters, dynamic pricing and net metering; table Advanced_Meters, Dynamic_Pricing, Net_Metering 2025; 2025, final; released October 7, 2026. www.eia.gov
How every figure is built: methodology. Found an error? Write to [email protected]; corrections are listed on the updates page.